Description
SPECIFICATIONS
Battery Included: no
Brand Name: SONOFF
Casing materials: PC+ABS
Certification: CE
Color: Black
Communication method: Zigbee
Dimension: 152x100x46mm
Does It Includes Wireless Communication: Yes
High-concerned chemical: None
Inbox adaptor: No
Origin: Mainland China
Power Source: AC&DC,Ac
Rating: 6V(4*1.5V AA)
Thread Standard: BSP, NH
Watering temperature: 5°C~40°C
Waterproof: IP55
Wireless Communication: ZIGBEE
Wireless connection: Zigbee 3.0
Working humidity: 5%-95%RH, non-condensing
Working pressure: 0.06-0.8MPa
Working temperature: 5°C~60°C
SONOFF SWV Zigbee Smart Water Valve IP55 Automatic Irrigation Easy Install Remote Control Time Schedule via eWeLink Alexa Google
With SONOFF Zigbee Smart Water Valve, you can automate and control your watering system with ease. It is easy and quick to install, simply connect the Zigbee Smart Water Valve between the faucet and the hose to quickly upgrade your irrigation system in just three minutes, automatically watering your lawn, garden, vegetable patch, and more. Open the eWeLink app, tap the button, and you can start today's irrigation immediately. Set a smart scene for the Zigbee Smart Water Valve to irrigate automatically in the early morning, making your life easier.
The Zigbee Smart Water Valve features schedule and capacity modes, supporting single and cyclic irrigation. Say goodbye to forgotten watering and wasted water sessions, ensuring optimal hydration for your home plants or crops. Whether you're at home or away, our smart water valve provides the perfect amount of water, keeping your plants healthy and vibrant.
The Zigbee Smart Water Valve's battery can be used continuously for 20 months, covering two irrigation cycles(Once a day, for one hour each time). If there is a water shortage during irrigation, the app will immediately send a notification. Support checking up to 180 days of water usage and duration through the app. Understand daily, weekly, or monthly data to better control irrigation amounts and save more on water bills. You can use multiple Zigbee Smart Water Valves to work together, setting different irrigation modes for various areas of your home, and creating a personalized smart irrigation system.
SONOFF Zigbee Smart Water Valve is compatible with Zigbee hubs supporting Zigbee 3.0, including SONOFF iHost, SONOFF NSPanel Pro, ZB Bridge Pro, ZBDongle-P, ZBDongle-E, Echo Plus 2nd...
*NSPanel Pro and iHost will support Zigbee water valve in July.
The Zigbee Smart Water Valve supports voice control through Alexa and Google Home. A simple voice command can close the water valve when you think it's about to rain outside. The Zigbee Smart Water Valve can integrate into open-source platforms via ZBDongle-P or ZBDongle-E to perform automatic irrigation functions.
Let's discover the future of lawn care and plant watering with the SONOFF Zigbee smart water valve!

Easy Installation, Smart Irrigation
Simply connect the Zigbee Smart Water Valve between the faucet and the hose to quickly upgrade your irrigation system in just three minutes, automatically watering your lawn, garden, vegetable patch, and more.


Customize Suitable Irrigation Plans
The Zigbee Smart Water Valve features schedule mode and capacity mode, supporting both single and cyclic irrigation. Allow you to provide more targeted care for your home plants or crops.

Just a Touch to Irrigation
Busy with other tasks or traveling and unable to tend to your lawn in the morning? Open the eWeLink app, tap a button, and start today’s irrigation immediately.

Effortless Automation Timed Irrigation
Don’t want to wake up early to irrigate on weekends and just want to sleep in? Set a smart scene for the Zigbee Smart Water Valve to irrigate automatically in the early morning, making your life easier.

A Simple Voice to Control
Supports voice control through Alexa and Google Home. A simple voice command can close the water valve when you think it’s about to rain outside.

Peace of Mind from Every Way

Working Together for Smart Irrigation
You can use multiple Zigbee Smart Water Valves to work together, setting different irrigation modes for various areas of your home, and creating a personalized smart irrigation system.

Track Water Data for 180 Days
Support checking up to 180 days of water usage and duration through the app. Understand daily, weekly, or monthly data to better control irrigation amounts and save more on water bills.

Expand Capabilities on Open-Source Platforms
The Zigbee Smart Water Valve supports Zigbee 3.0. Integrate it into open-source platforms via ZBDongle-P or ZBDongle-E to perform automatic irrigation functions.



Return & Exchange Policy
Return & Exchange Policy
Welcome to Royal Orvix. Customer satisfaction is our priority. Please read our Return & Exchange Policy carefully before making a purchase.
Returns
We accept returns within 14 days of receiving your order.
To be eligible for a return:
- The item must be unused and in its original condition.
- The item must be returned in its original packaging.
- Proof of purchase or order number is required.
Non-Returnable Items
The following items cannot be returned:
- Personal care products
- Beauty products that have been opened or used
- Customized or personalized items
- Gift cards
- Items marked as final sale
Damaged or Incorrect Items
If you receive a damaged, defective, or incorrect item, please contact us within 48 hours of delivery.
Please provide:
- Your order number
- Clear photos of the product
- Photos of the packaging (if applicable)
We will review your request and arrange a replacement or refund if approved.
Exchanges
We only replace items if they are defective, damaged, or if the wrong item was sent.
To request an exchange, contact our support team with your order details and supporting photos.
Refunds
Once your returned item is received and inspected, we will notify you of the approval or rejection of your refund.
If approved:
- Refunds will be issued to the original payment method.
- Processing times may vary depending on your payment provider.
- It may take several business days for the refund to appear in your account.
Order Cancellation
Orders can only be canceled within 12 hours of purchase.
Once an order has been processed or shipped, cancellation may no longer be possible.
Shipping Costs
- Original shipping charges are non-refundable.
- Customers may be responsible for return shipping costs unless the return is due to our error or a defective product.
Contact Us
For any return, exchange, or refund requests, please contact us:
Royal Orvix Customer Support
Email: support@royalorvix.com
Website: www.royalorvix.com
Response Time: 24–48 Business Hours
Shipping Information
Shipping Information
At Royal Orvix, we strive to deliver your orders as quickly and efficiently as possible.
Order Processing
- Orders are typically processed within 1–2 business days.
- Orders are processed Monday through Friday, excluding public holidays.
- Once your order has been shipped, you will receive a tracking number via email.
Estimated Delivery Times
USA Warehouse Products
Products shipped from our USA warehouse are usually delivered within:
2–3 Business Days
International Warehouse Products
Products shipped from our international fulfillment partners are usually delivered within:
3–7 Business Days
Please note that delivery times are estimates and may vary depending on your location, weather conditions, carrier delays, customs processing, or peak shopping seasons.
Tracking Your Order
Once your order has been dispatched, you will receive tracking information that allows you to monitor your shipment's progress.
Shipping Delays
While we work hard to ensure timely deliveries, occasional delays may occur due to:
- High order volumes
- Carrier issues
- Customs inspections
- Weather disruptions
- Public holidays
In such cases, we appreciate your patience and understanding.
Incorrect Shipping Information
Customers are responsible for providing accurate shipping details at checkout.
Royal Orvix is not responsible for delays or failed deliveries resulting from incorrect addresses provided by customers.
Lost Packages
If your package appears to be lost in transit, please contact our support team. We will work with the shipping carrier to investigate and assist in resolving the issue.
Contact Us
For shipping-related questions, please contact:
Royal Orvix Customer Support
Email: support@royalorvix.com
Website: www.royalorvix.com
Response Time: 24–48 Business Hours
